For Operators Running a campground? Add revenue without adding rooms.

Multi-unit · commercial code 267 · 355 · 1499

For operators

Built for campgrounds, glamping resorts, and STR operators.

RV park owners, campground operators, glamping resorts, and short-term rental investors building rental portfolios. If you've got land and you're trying to add stays without adding traditional rooms, this is for you.

The numbers

Typical build time

3–6 mo

Premium treehouses command higher nightly rates than a comparable cabin, and occupancy holds through the shoulder seasons. Payback depends on your build size, nightly rate, financing, and occupancy — model your own below.

Nightly rate vs. cabin
Premium
Occupancy goal
65–85%
Build window per unit
3–6 mo

Illustrative ranges, not a market guarantee — every project differs. Run your own from the AirDNA baseline below.

Run your own

Model your own numbers.

Set your nightly rate, occupancy, and build cost, then see cash flow, cash-on-cash return, and payback period — every figure is yours.

Open the ROI Calculator

Occupancy

Booked when cabins sit empty.

A well-built treehouse holds its rate and fills nights through the shoulder seasons — the cooler months that quietly decide a season's profit.

TreehouseComparable cabin
JFMAMJJASOND
Occupancy goal
65–85%
Shoulder season
Holds
Vs. cabin, off-peak
Higher

Illustrative comparison — not a market guarantee. Model your own in the ROI calculator.

What's different

Three things residential builds don't need.

01

Built to commercial code

Occupancy standards, ADA available, engineered for repeated guest turnover. Inspections handled.

02

Multi-unit packages

Two to twelve units quoted as a single engagement. Materials buying at scale, design time amortized across the build.

03

Faster turnaround

A 3–6 month build window per unit on repeatable plan sets. Custom one-offs run longer; multi-unit plans don't.

FEATURED · W. MARYLAND TWO RENTABLE UNITS

Adding revenue without adding rooms.

HOT TUB · DUAL DECKS LEAD · TREE TOP BUILDERS
How working with me goes

Inquire to handoff. Five steps.

The Process Inquire to Handoff · Per Unit
01

Inquire

Quick form, 24-hr response, no obligation.

Day 1
02

Site visit

Paid, credited to your build. Site walk + assessment + written scope.

Week 1
03

Design

Engineered drawings, scope agreement, materials list.

Weeks 2–4
04

Build

Phase invoicing tied to milestones.

Weeks 4–14
05

Handoff

As-built docs, maintenance manual, year-1 warranty.

Week 14

Multi-unit projects quoted as packages — talk to me about volume.

Dylan White
Founder

Units in the field

Built to book out, season after season.

01Rentable units at dusk
02The elevated walkway in · Western Maryland
03The kitchen
04A guest bedroom
05The loft

01 / 05

Ready?

Let's talk commercial builds.

Book a Site Visit

267 · 355 · 1499